Menu
Log in


Islamorada

Community alliance

Advocacy For Residents, Education and Preservation




FRONT PAGE

  • 13 Oct 2026 11:09 AM | Anonymous
     

  • 13 Oct 2026 11:07 AM | Anonymous
     

  • 13 Oct 2026 11:02 AM | Anonymous

    What a way to celebrate a birthday!  Jerry O’Cathey went skydiving!  Happy Birthday Jerry!

  • 5 Oct 2026 5:40 PM | Anonymous

    And a parent and an Islamorada resident and taxpayer.



    Why does Islamorada government continue to punish Lower Mat?



    Many Islamorada canals were dredged in the 1950s–60s without adequate tidal exchange.


    A canal restoration effort by the Village on Lower Matecumbe has demonstrated immediate, dramatic improvements in water quality at four locations with new culverts connecting dead-end canals to improve circulation.


    A fifth location is a part of that culvert project.


    It is the most important part.


    It was planned and engineered to provide a culvert under U.S. One at MM74 connecting the oceanside and bayside canal systems.


    The mayor of Islamorada announced in a video last week that the project connecting ocean and bay waters was done.


    That is not true! It is a disaster.


    Marine experts have been gushing with enthusiasm about the remarkable results we will experience when this culvert under U.S. One is completed.


    We are anxious to see the results. We have received extraordinary grants to make this happen.


    But in the interim, the contractor hired by the Village at nearly $9 million, seems to have created a huge problem. (See the photos later in the newsletter)


    We deserve to know who is responsible for overseeing this contract.


    How have we allowed this absolute disaster to go on for nearly a year along our “Scenic Highway” through Islamorada?


    The bike path/Heritage Trail has been completely destroyed.


    No public acknowledgement of the status or “I’m sorry” to the folks impacted by the Village or the contractor.


    The Heritage Trail is part of the Florida State Park System. From their website – “90 miles of multi-use trails link the Keys, offering visitors a spectacular way to experience the islands.”


    Not so spectacular now – in fact not even usable.


    For Lower Matecumbe residents is was their way to bike, walk, or jog to Annes Beach, the Channel Two Fishing Bridge, and points north on the island.


    There are subdivisions and condos with nearly a 1000 homes within a mile of this section of the bike path. Residents are unable to use this section of bike path.


    An occasional photo op of politicians is printed in the local papers when grants are awarded to fix the problems – but residents’ complaints with the reality of the situation, seem to fall on deaf ears with no photo op or media coverage.


    Is Lower Matecumbe the forgotten island?


    One trip past that totally disgusting stretch of right of way should cause great embarrassment to those entrusted to remedy and oversee this situation.


    We get regular reports from FKAA with apologies for their comparatively minor disruptions along U.S. One.


    No such reports from the Village or the contractor.  When do the folks near MM74 get an apology?


    They are due more than just an apology.


    They need their bike path and quality of life restored.


    They deserve some answers.


    Tom

  • 5 Oct 2026 5:38 PM | Anonymous

    Millage rate for property taxes and the budget for Oct 1, 2026 through September 30, 2027 were approved September 28 after this final budget hearing was rescheduled twice.  The recommended millage rate of 2.7231 in the agenda would have been a 10.00% increase above the rollback rate of 2.4756.  


    However, at the last minute, Council voted unanimously to reduce the millage rate from the recommended 2.7231 mills to 2.65 mills, still an unannounced 7.04% tax increase.  



    The confusion came when the Council had to approve a budget that matched the amended millage. Ever since the original budget workshops at the beginning of August, the majority of the council had seemed adamant that the 10% increase was necessary to continue providing the services the residents expect.  


    Any millage rate above the rollback would require a super majority vote - at least 4 positive votes.  


    The council approved a budget, not available to the council or public, corresponding to the 2.65 millage rate, promising to review and amend the budget as soon as feasible.  


    In the confusion, did the Council meet all of the strict notice requirements for Budget Hearings?

     
  • 5 Oct 2026 5:36 PM | Anonymous

    was presented to the community last Wed, Sep 30. It was explained that there are no plans for additional public workshops.  The 253-page plan presented is considered the “final draft.” The next step is approval by the LPA and then on to the Village Council for final approval following two public hearings.


    Able City East Partner, Jason King, stated that the public participation thus far for Islamorada has exceeded the typical community involvement in most municipalities where they have worked. He did indicate that they would continue to provide corrections and improvements suggested prior to the final public hearings.


    Able City will also provide a list of the LDRs that must be amended, added or deleted to assure the Comprehensive Plan and Land Development Regulations remain in cinque.


    There are eleven different elements in the plan, including future land use, housing, conservation, property rights, etc.  


    The draft of the new plan is available on the Village website: click here.  We suggest every resident should look through the policies in the amended plan and submit suggestions if you see things that concern you.

     


  • 5 Oct 2026 5:34 PM | Anonymous

    Keystar, the construction company hired by the School Board to do $3.8 million in baseball field upgrades at Founders Park, provided engraved shovels as Islamorada officials, Monroe County School Board members and Coral Shores High School coaches and staff broke ground Oct. 1, at Founders Park.



    Additional improvements, including dugouts, concession stand, and restrooms that would have brought the cost to $6.1 million, are expected to be done later.

    After months of delays, the field is scheduled to be ready in time for the January start of baseball season.


    With permitting and weather issues, there is a definite urgency to assure the Coral Shores baseball team has a home field come baseball season.

    We were disappointed officials couldn’t find a time after school hours for the groundbreaking so the baseball team and more community members could attend!

     
  • 5 Oct 2026 5:32 PM | Anonymous

    Lower Matecumbe was the first location in the Florida Keys to have a bike path along the entire length of the island, paved in 1987. The pride of the island. It soon became the community park for the island where people walked, jogged and rode bikes, visiting with neighbors along the way. A lovely tree lined pathway.  


    And in fact it is a part of the Florida State Park: Overseas Heritage Trail.  


    On February 10, 2005 the Department of Transportation deeded the westernmost 50’ of the US One Right of Way on most of Lower Matecumbe to Islamorada, making the Village responsible for the portion where the bike path is located… ours to own, upgrade, maintain.


    For at least the last ten years the bike path has been in need of major repairs, especially true from MM73.5 to MM74.5.  And it gets continually worse as there is very little paved path left.  

    Photos from 2024 show regular flooding and missing pavement.  


    Elevating Bike Path: In July 2025, the Village received notification from the Department of Transportation that Islamorada was granted $200,000 from the Florida Legislature for the construction of bike path improvements.


    Terms of the grant required a construction contract by 2/1/2026 with construction completed by 6/30/2026. Now past.

    Conflicting Projects: In April of 2025 the Village agreed to a $8,991,020 contract with LPS Contracting to install culverts under 5 roadways on Lower Matecumbe including a 48” culvert under U.S. One at MM74 to connect the dead-end canals to improve water flow and dramatically improve water quality.  

    Work began on the culvert projects in November 2025, utilizing the bike path  that was to be elevated, now a staging area for the culvert project.


    The first work was for the U.S. 1 culvert, on both sides of U.S. One just south of Palm Dr - between two homes owned by the Florida Sea Base and across the lagoon from Iroquois Dr.


    While the other four culvert projects have been completed on the bayside side streets, the work started at the beginning, nearly a year ago, remains an unfinished construction site between two residential homes owned by the Sea Base.  Far from an orderly construction site.

  • 5 Oct 2026 5:30 PM | Anonymous

    In April of 2025 the Village agreed to a $8,991,020 contract with LPS Contracting to install culverts under 5 roadways on Lower Matecumbe including a 48” culvert under U.S. One at MM74 to connect the dead-end canals to improve water flow and dramatically improve water quality.  

    Work began on the culvert projects in November 2025, utilizing the bike path  that was to be elevated, now a staging area for the culvert project.


    The first work was for the U.S. 1 culvert, on both sides of U.S. One just south of Palm Dr - between two homes owned by the Florida Sea Base and across the lagoon from Iroquois Dr.


    While the other four culvert projects have been completed on the bayside side streets, the work started at the beginning, nearly a year ago, remains an unfinished construction site between two residential homes owned by the Sea Base.  Far from an orderly construction site.

    An unwelcomed mess at the front door of a Sea Base home for a year now.


  • 5 Oct 2026 5:27 PM | Anonymous

    Little work seems to have been done for months now as apparently the contractor, LPS, hired by the Village is not able to do the culvert under the highway as per their contract and has proposed hiring a subcontractor.  At whose expense?


    We have received documentation of payments to LPS of $5,870,321 for the culverts already installed. 


    But the easement allowing the work to proceed through Sea Base property has expired and the Sea Base appears reluctant to allow this contractor to continue work through their property.  

    What about the Lower Matecumbe Bike Path Restoration - residents are getting impatient with this portion of the Scenic Highway through the Village!


    The Heritage Trail and Islamorada’s “Park” has been out of commission for years now.  At least it should be neatly maintained if it must be a construction site.  The photos below were taken Oct 3, 2026 but are typical of earlier photos on file since the culvert project began.





    Where is the coordination?  Will the $200,000 grant for elevating and restoring the bike path/Heritage Trail in the same area expire?


    The FKAA Water Line is next!  Will they need the bike path for staging?  

     

Your Chance to Speak Up!  


Attend a Meeting - Get involved!

pending link**Monday, December 7, 2026 5:00 PM

Workforce Affordable Housing Committee Meeting

Where: Administrative Center, 87800 Overseas Highway, 3rd Floor, Islamorada, Florida

Monday, December 7, 2026 5:30 PM

LOCAL PLANNING AGENCY MEETING

Where: Founders Park Community Center, 87000 Overseas Highway, Islamorada, Florida

Tuesday, December 8, 2026 5:30 PM

REGULAR VILLAGE COUNCIL MEETING

Where: Founders Park Community Center, 87000 Overseas Highway, Islamorada, Florida

Monday, December 14, 2026 5:30 PM

LOCAL PLANNING AGENCY MEETING

Where: Founders Park Community Center, 87000 Overseas Highway, Islamorada, Florida

Tuesday, December 15, 2026 10:00 AM

CODE COMPLIANCE HEARING

Where: Zoom

If you have suggestions about what you'd like to see on this site and information that is important to you, please let us know.

Our vision

To enhance the community of Islamorada by preserving the quality of life of the residents as well as the beauty and vitality of the native ecosystems and to stop any further degradation of our community from over-development.

Mission statement

To provide the Islamorada residents with information about events occurring in our community that will impact our quality of life, preservation of our native ecosystems, land development, lawful and transparent governance.


CONTACT US

ICA.in.Keys@gmail.com
Islamorada Community Alliance

P.O. Box 1507

Tavernier, FL  33070-1507


SUBSCRIBE TO OUR NEWSLETTERS

You can also keep up with the local news about Islamorada by subscribing to our newsletters.  Send us a note at 

ICA.in.Keys@gmail.com


Go to our Newsletter Archives:

Islamorada Community Alliance Newsletters

The Village of Islamorada's Newsletter Archive:

The Village Weekly Updates


 

Click on Entry

Let Us Showcase

your favorite photos


Click on a photo and page through these local photos





Help us preserve Islamorada

DONATE TO THE ICA


Our vision

To enhance the community of Islamorada by preserving the quality of life of the residents as well as the beauty and vitality of the native ecosystems and to stop any further degradation of our community from over-development.

Mission statement

To provide the Islamorada residents with information about events occurring in our community that will impact our quality of life, preservation of our native ecosystems, land development, lawful and transparent governance.

DONATE TO THE ICA

Your tax deductible donations allows the ICA to keep you informed about important events that will impact and help protect our quality of life, our neighborhoods, property values and native ecosystems. Your donations make this possible and are most appreciated.

Contact Us

ICA.in.Keys@gmail.com

Islamorada Community Alliance

P.O. Box 1507

Tavernier, FL  33070-1507




©  Islamorada Community Alliance 2026 - All Rights Reserved